Openstate fundingDirect feed coverageTier 2 intelligence

A grant from Santa Monica Mountains Conservancy

Proposition 4 – River Grant

This is a potentially strong opportunity for an eligible nonprofit, public agency, or Tribal Government with a water-related project in the Santa Monica Mountains Conservancy Zone. The project must comply with Section 91032, address at least one Section 91032(b) purpose, and support either climate resiliency or protection of the Los Angeles River Watershed or alignment with the ULART working group’s revitalization plan. Award amounts, total funding, cost share, deadline, and detailed application requirements are not supplied, so budget, timing, and submission decisions require confirmation with the funder.

Start here · Eligibility

Check whether your organization qualifies

Answer 5 focused questions in about 60 seconds before investing time in the application.

Take Eligibility Quiz
2 source-confirmed criteria · No signupReview criteria

Potential award

Not specified

Time remaining

Rolling or unknown

Application load

Effort unclear

Best next move

Take the eligibility quiz

Apply

Verified against the source on 8/23/2026

01

Start here

Confirm eligibility

Check your fit in about 60 seconds.

Eligibility requirementsQuestion 1 of 5
About 60 seconds totalConfirmed criterion

Does your organization have the required nonprofit status?

What does this mean?

Eligible nonprofits are named in the source requirements.

Review supporting source ↗
Does your organization have the required nonprofit status?
Select an answer to continue

No signup · Answers stay in this browser session

This is an explainable self-assessment, not a win probability or legal determination. Hard eligibility conflicts are never averaged against softer program-fit signals. Always verify the official notice.

Optional Review source criteria and citations

Nonprofit status

Eligible nonprofits are named in the source requirements.

Review source ↗
confirmed

Geography

Projects must be within the Santa Monica Mountains Conservancy Zone.

Review source ↗
confirmed

Organization size

No organization-size limit was captured.

Review source ↗
unclear

Program area

Environment & Water

Review source ↗
inferred

Population served

No specific population was captured.

Review source ↗
unclear

Matching funds

Cost-share requirement is unclear.

Review source ↗
unclear

Registrations

Confirm required registrations with the funder.

Review source ↗
inferred

Exclusions

Review the full notice for exclusions and prohibited uses.

Review source ↗
unclear
02

Grant-writer assessment

Understand the opportunity

Start with the practical interpretation. Open the complete source narrative when you need the underlying detail.

Plain-English explanation

Plain-English explanation

This is a potentially strong opportunity for an eligible nonprofit, public agency, or Tribal Government with a water-related project in the Santa Monica Mountains Conservancy Zone. The project must comply with Section 91032, address at least one Section 91032(b) purpose, and support either climate resiliency or protection of the Los Angeles River Watershed or alignment with the ULART working group’s revitalization plan. Award amounts, total funding, cost share, deadline, and detailed application requirements are not supplied, so budget, timing, and submission decisions require confirmation with the funder.

Editorial analysis

What the funder is trying to accomplish

The program supports water-related projects under Chapter 2 of Proposition 4 concerning safe drinking water, drought, flood, and water resilience. Projects must comply with Section 91032, include at least one purpose in Section 91032(b), and support an identified Los Angeles River regional priority.

Editorial analysis

Strong-fit project signals

The applicant is a nonprofit, public agency, or Tribal Government. The project is within the Santa Monica Mountains Conservancy Zone. The project protects or restores rivers, wetlands, streams, lakes, or watersheds; improves fish and wildlife resilience; or enhances climate resilience, water supply, or water quality. The project improves climate resiliency or protection of the Los Angeles River Watershed, or aligns with the ULART working group’s revitalization plan. The proposal can show compliance with Section 91032 and identify at least one specific Section 91032(b) purpose.

Editorial analysis

What reviewers may prioritize

No formal scoring criteria or reviewer rubric are supplied. Based on the stated conditions, a proposal should make a clear, traceable case for Section 91032 compliance, at least one Section 91032(b) purpose, and one required Los Angeles River regional priority. This is an inferred proposal strategy, not confirmed reviewer criteria.

Source dossier Read the full official program description
Source-backed synopsis

What this grant funds

This program supports Water-related projects must align with Chapter 2 of Proposition 4, supporting Safe Drinking Water, Drought, Flood, and Water Resilience. All projects must comply with Section 91032 and must include at least one specific purpose outlined in Section 91032(b). Eligible efforts protect or restore rivers, wetlands, streams, lakes, or watersheds; improve the resilience of fish and wildlife; or enhance climate resilience, water supply, or water quality. Projects must also support at least one regional priority: improving the climate resiliency or protection of the Los Angeles River Watershed, or aligning with the ULART working group’s revitalization plan. Proposition 4 – River

Read the complete official description ↗
03

Decision economics

Size the opportunity

Use the source facts below to judge whether the likely return justifies the application effort.

Award range
Not specified
Total program funding
Not specified
Expected awards
Not specified
Geography
Projects must be within the Santa Monica Mountains Conservancy Zone.
Cost share
Not specified
Assistance listing
Not specified

Mission alignment

Compare your program with Environment & Water.

Geographic fit

Projects must be within the Santa Monica Mountains Conservancy Zone.

04

Working plan

Build the application

The generated milestones are planning aids. Only the official notice establishes required dates.

Requirements captured

Detailed requirements have not yet been extracted.

Review the official notice for forms, attachments, narrative limits, budget instructions, submission system, and contacts.

Official deadline

Not specified

Effort unclear based on requirements currently captured.

A preparation schedule will appear when a confirmed future deadline is available.

05Past behaviorCompare historical awardsHistorical patterns provide context, but do not predict or guarantee future funding decisions.
No licensed historical awards are currently linked to this opportunity.
06Audit trailVerify the evidenceSee where the facts came from, when they were checked, and what has materially changed.

Source record

Source verified means the official record was successfully checked. It does not mean every eligibility or application field has been extracted.

Verification
verified
Source
state CA
Last checked
8/23/2026, 8:51:39 AM
Content updated
8/13/2026, 9:36:58 AM
Review
Automated normalization; not yet expert-reviewed
Open official source ↗

Material changes

  1. Updated url.

  2. Updated categories.

  3. Updated categories.

Verify before applying. Official funder documents control. Derived analysis and preparation dates should not replace the notice.
Browse the directory

Explore related funding collections

This grant appears in these evidence-backed collections based on its geography, program focus, and supported uses.

Keep searchingSimilar and alternative grantsExplore verified opportunities related by program area, funder, or funding type.
Quick answersFrequently asked questionsGet concise answers about Proposition 4 – River Grant.
Is Proposition 4 – River Grant currently open?

Yes, based on the latest source record. The deadline is Not specified. Because funders can amend or extend notices, confirm the date and submission instructions on the official application page. The source was last checked 8/23/2026.

How much funding does Proposition 4 – River Grant provide?

Proposition 4 – River Grant lists Not specified per award. The expected number of awards has not been captured, so the award range alone should not be treated as an estimate of competitiveness.

Who can apply to Proposition 4 – River Grant?

Nonprofit; Public Agency; Tribal Government Applicants should still complete the eligibility quiz and verify every condition in the official notice; a general fit does not override exclusions or registration requirements.

Does Proposition 4 – River Grant require matching funds?

The captured source facts do not clearly establish a matching-funds requirement. Do not assume that means no match is required: review the budget and cost-sharing sections of the official notice before approving the project budget.

What should I prepare before applying to Proposition 4 – River Grant?

Effort unclear is currently estimated, but detailed forms and attachments have not yet been extracted. Before drafting, open the official notice and identify registrations, required forms, narrative sections, page limits, budget instructions, and submission-system requirements.

Maevena

Grant intelligence for non-profits

Find current opportunities, understand the source evidence, and reach the authoritative next step with fewer surprises.

Trust the source

Maevena supports research and initial decisions. Always confirm final eligibility, deadlines, and application requirements with the official funder.

Report a correction
© 2026 Maevena. Evidence-backed grant intelligence for non-profits.